How to Read an HDD Bore Plan: Pitch, Rod Length and Bend Radius

Rod 12 on a directional drilling plan shows a pitch of −8%. Rod 13 shows −4%. The head still points down at both stations, yet the planned direction has turned upward toward level. A buyer reading those figures needs two more pieces of information before discussing the drill pipe with a supplier: how long is the interval, and what radius did the designer assign to the curve?

A rod-by-rod bore plan describes the proposed alignment at successive intervals along the string. Each row ties a position to a direction. Read several adjacent rows together to understand the shape of the crossing. A single figure copied into a purchase request can lose the unit, reference point and equipment assumptions that give it meaning.

What the columns on an HDD bore plan mean

ColumnQuestion it answersDetail to check
Rod numberWhich interval is this?The first interval can be shorter than a full working rod.
Distance or lengthHow far has the alignment progressed?Identify horizontal distance and length along the curved path.
Depth or elevationWhere is the planned bore relative to the stated reference?Local ground level and a fixed elevation datum can give different trends.
PitchWhich way is the tangent pointing?Read the unit, sign convention and location of the reading.
Bend radiusHow sharply does the alignment turn?A larger radius describes a gentler curve.

Report formats vary. The Vermeer BorePlan manual shows distance, length, depth, pitch and radius on the same rod report. The software can flag an interval below the bend limit entered in the bore properties. Check which limit the planner entered. A flag based on yesterday’s pipe selection may tell the crew very little about a replacement rod proposed this morning.

Jobsite illustration of threaded drill rods beside a tracked directional drill
Bore planning illustration with a profile drawing and a bundle of HDD drill rods staged by the rig.

Read pitch as a direction and pitch change as a difference

A straight line falling eight units for every hundred horizontal units has a pitch of −8% under a positive-up convention. Percent and degrees use different scales. For example, a 10% grade is about 5.7 degrees. Preserve the unit symbol when copying a reading from a drawing or a locator display.

Consider four successive end readings of −8%, −4%, 0% and +4%. The first change is positive four percentage points. Through the first two readings the path is still directed downhill. At the third point its tangent is level. At the fourth it points uphill. Those numbers illustrate how to read a sheet. They provide no equipment limit or steering instruction.

Can you determine the depth change from those four readings alone? You also need the distances between stations and the shape of the intervening path. On a curve, pitch changes within the interval. In addition, the surface above the head may slope. An increase in depth below ground can result from rising ground even where the bore elevation stays constant. For a clearance review, identify the design reference and consult the approved profile.

Why two equal pitch changes can describe different bends

Picture two circular arcs in a vertical plane. Each begins level and ends at the same upward angle. One makes the turn in half the arc length of the other. Its radius is half as large. A table listing only the start and end pitches would conceal that difference. The length column matters especially at entry, where the first reported interval may represent only part of a rod.

A side view also leaves out a turn to the left or right. Two rows can show little change in pitch while the heading changes in plan view. Where horizontal and vertical curves overlap, ask the designer which combined radius governs the alignment. The two pitch readings alone cannot establish the tightest three-dimensional bend.

Match the report to the pipe being quoted

Put the proposed rod part number, effective working length and manufacturer’s bend specification beside the plan revision. Identify the fitted pipe system as well as the drill model. A rig that has changed hands may carry different pipe from its original configuration. Use the Richdrill HDD drill pipe catalogue to identify the equipment family, then ask the supplier to confirm the specific rod and the basis of its rating in writing.

The installed conduit or pipeline also has bending requirements. A curve acceptable to the drill string can still be too tight for the installed product. Tooling and ground conditions also enter the review. Vermeer discusses these inputs in its guide to preparing a proposed HDD bore plan. Its worked example uses particular equipment. Keep the equipment identification attached if you share an extract with a buyer.

What changes when the supplier offers a shorter rod?

Suppose the thread designation matches but the proposed rod has a shorter working length. The physical rod ends will fall at different points along the profile. Row 15 on the original sheet may no longer correspond to the end of the fifteenth rod in the field. Send the revised part number, working length and rating to the planner. A change to the quantity on the packing list cannot by itself update the field plan.

Once the design and pipe are confirmed, distinguish working quantity from reserve stock. Record the length along the string that the standard rods must cover, account for the actual setup and round the working count up. The worked drill rod count example shows how a crew can carry those assumptions into its dispatch note.

Keep planned readings separate from field observations

A shift note that says “rod 13, minus four” leaves three questions for the incoming crew. Was the value measured or copied from the plan? Was it percent or degrees? At which station did it apply? A clearer entry records the plan revision and station, gives planned and observed values separate columns, and identifies the reference point. Where a reading differs from plan, preserve the observation and follow the project’s approved review process. That record lets the next shift investigate the same location without reconstructing it from a rod number alone.